Home
|
Partners
|
Help us build GEO
|
About Us
|
Contact Us
Power Plants
View and Edit Plant Data
Create New Plant
Perform Analysis
Map Power Plants
Fuels and Resources
View and Edit Resource Data
Create New Resource
Perform Analysis
Map Fuels & Resources
Energy Transmission
View and Edit Transmission Data
Create New Transmission System
Perform Analysis
Map Transmission Systems
Energy Consumers
View and Edit Consumers Data
Create New Consumers System
Perform Analysis
Map Consumer Systems
Map Data in GEO
Login to submit data
Username:
Password:
Register
Last Edited by
rajangupta
on
2010-05-09 00:06:24
History of Edits for Tis Abay I Hydroelectric Power Plant Ethiopia
All Edits Awaiting Moderation
Quick Access Tools
Hydro in Ethiopia:
Abstract
Tis Abay I Hydroelectric Power Plant Ethiopia is located at Chara Chara, Amhara, Ethiopia. Location coordinates are: Latitude= 11.485576089729, Longitude= 37.589786052704. This infrastructure is of TYPE Hydro Power Plant with a design capacity of 11.4 MWe. It has 1 unit(s). The first unit was commissioned in 1964. It is operated by Ethiopian Electric and Power Company.
Identifiers for Hydro
Name
Status of Plant
Please Select
Operating Fully
Operating Partially
Built and In Test Stage
Under Construction
Final Bid and Approval Stage
Design and Planning Stage
Mothballed Partial
Mothballed Full
Decommissioned
Plant Efficiency and Impact
Please Select
High Efficiency and Low Enivronmental Imapct
High Efficiency and Medium Environmental Impact
High Effciency and High Environmental Impact
Medium Efficiency and Low Environmental Impact
Medium Efficiency and Medium Environmental Impact
Medium Efficiency and High Environmental Impact
Low Efficiency and Low Environmental Impact
Low Efficiency and Medium Environmental Impact
Low Efficiency and High Environmental Imapct
Plant Overall Rating
State-of-the-art
Worth Duplicating
Environmentally Responsible
Country Assigned Identification Number
GEO Assigned Identification Number
Select Currency for data in this page
No universal currency
UAE Dirham
Afghani
Lek
Armenian Dram
Netherlands Antillian Guilder
Kwanza
Argentine Peso
Australian Dollar
Aruban Guilder
Azerbaijanian Manat
Convertible Marks
Barbados Dollar
Taka
Bulgarian Lev
Bahraini Dinar
Burundi Franc
Bermuda Dollar
Brunei Dollar
Boliviano
Brazilian Real
Bahamian Dollar
Ngultrum
Pula
Belarussian Ruble
Belize Dollar
Canadian Dollar
Congolese Franc
Swiss Franc
Chilean Peso
Yuan Renminbi
Colombian Peso
Costa Rican Colon
Cuban Peso
Cape Verde Escudo
Czech Koruna
Djibouti Franc
Danish Krone
Dominican Peso
Algerian Dinar
Kroon
Egyptian Pound
Nakfa
Ethiopian Birr
Euro
Fiji Dollar
Falkland Islands Pound
Pound Sterling
Lari
Cedi
Gibraltar Pound
Dalasi
Guinea Franc
Quetzal
Guinea-Bissau Peso
Guyana Dollar
Hong Kong Dollar
Lempira
Croatian Kuna
Gourde
Forint
Rupiah
New Israeli Sheqel
Indian Rupee
Iraqi Dinar
Iranian Rial
Iceland Krona
Jamaican Dollar
Jordanian Dinar
Yen
Kenyan Shilling
Som
Riel
Comoro Franc
North Korean Won
Won
Kuwaiti Dinar
Cayman Islands Dollar
Tenge
Kip
Lebanese Pound
Sri Lanka Rupee
Liberian Dollar
Loti
Lithuanian Litas
Latvian Lats
Libyan Dinar
Moroccan Dirham
Moldovan Leu
Malagasy Ariary
Denar
Kyat
Tugrik
Pataca
Ouguiya
Mauritius Rupee
Rufiyaa
Kwacha
Mexican Peso
Malaysian Ringgit
Metical
Namibia Dollar
Naira
Cordoba Oro
Norwegian Krone
Nepalese Rupee
New Zealand Dollar
Rial Omani
Balboa
Nuevo Sol
Kina
Philippine Peso
Pakistan Rupee
Zloty
Guarani
Qatari Rial
New Leu
Serbian Dinar
Russian Ruble
Rwanda Franc
Saudi Riyal
Solomon Islands Dollar
Seychelles Rupee
Sudanese Pound
Swedish Krona
Singapore Dollar
Saint Helena Pound
Slovak Koruna
Leone
Somali Shilling
Surinam Dollar
Dobra
El Salvador Colon
Syrian Pound
Lilangeni
Baht
Somoni
Manat
Tunisian Dinar
Pa'anga
Turkish Lira
Trinidad and Tobago Dollar
New Taiwan Dollar
Tanzanian Shilling
Hryvnia
Uganda Shilling
US Dollar
Peso Uruguayo
Uzbekistan Sum
Bolivar Fuerte
Dong
Vatu
Tala
CFA Franc BEAC
East Caribbean Dollar
CFA Franc BCEAO
CFP Franc
Yemeni Rial
Rand
Zambian Kwacha
Zimbabwe Dollar
Location
Latitude:
Longitude:
This location is:
Exact
Approximate
Within 50km
Unknown
Draw Lines:
Draw Polygons:
Width:
px
Height:
px
Amhara, Ethiopia
Description
Design Capacity (MWe)
Firm Capacity (MWe)
Plant Load Factor (%)
Location
Type of Plant
Please Select
Dam on river with reservoir
Dam with run-of-river generation
Barrage with run-of-river Generation
Weir on a River
Dam on a canal
Weir on a Canal
Dam on a lake
Water discharged from another project
Pumped Storage Power Plant
Tidal
Other
Short Description
Power Plant Used For
Please Select
Base Load
Base/Intermediate Load
Intermediate Load
Intermediate/Peak Load
Peaking Load
Peaking Load and Backup
Voltage Stabilization
Majority Exported
Seasonal: Base
Seasonal: Peaking
River/Lake/Canal Dammed
Year Project Commissioned
Project Benefits
Power Generation
Irrigation
Water / Flood Management
Navigation
Recreation and Sports
Tourism
City Water
Fish
Power Production Potential At Design
GW Hours per year at water head (m)
High Season Generation Months
to
Configuration of Powerhouses
Distance from Dam (m)
Electric Power Grid Connected To
Please Select
National Grid
Regional Grid
Municipal Grid
Local Grid
Captive or Standalone Grid
Captive and Grid Connected
Name/Operator
PPA(years)
Name of SubStation Connected To
Mean River Flow (cum/sec)
Name of
Main Reservoir
Lower Reservoir (if pumped storage)
Catchment Area (sq km)
At Full Reservoir Level (FRL)
Surface Area (sq km)
Altitude (m)
Capacity of Main Reservoir (MM cum)
at FRL
Useful/Live
Annual Flow Into Reservoir
(MM cum)
Sedimentation Rate (MM cum/year)
Impact on Project
Energy Content at FRL (GW hours)
Altitude Above Sea Level Main Reservoir (m)
at Maximum
at Minimum
Name of Dam
Height of the Dam (m)
Crest Altitude (m)
Crest Length of the Dam (m)
Width of Dam
at Crest (m)
at Base (m)
Type of Dam
Please Select
Concrete Gravity Dam
Concrete Arch Dam
Thin Concrete Arch Dam
Thick Concrete Arch Dam
Concrete Gravity-Arch Dam
Concrete Buttress Dam
Concrete Powerhouse Dam
Barrage
Weir
Concrete Weir
Masonary Gravity Dam
Masonary and Concrete Gravity Dam
Concrete faced Rockfill Dam
Concrete Dam with Embankments
Embankment
Embankment with Core
Embankment with Earthfill
Embankment with Rockfill
Embankment with Earth and Rockfill
Earthfill dam with Concrete Spillway
Embankment with Concrete Powerhouse
Embankment with Concrete Powerhouse and Spillway
Embankment with asphalt concrete core
Other
Describe
Height of Water Head
at Maximum (m)
at Minimum (m)
Water Flow Rate Through Turbines
(cum/sec)
Max Velocity (m/sec)
Water Storage Pumping Rate
(cum/sec)
Max Pumping Power (MWe)
FRL Generation Duration
(hours)
at Power (MWe)
Water Storage Pumping Time
(hours)
at Power (MWe)
Water Management Description
Environmental Issues
Capital Cost of Plant
and/or In US Dollars
In Year (YYYY)
Associated Infrastructure (AI)
Unit Information
Unit #
Capacity (MWe)
Date Commissioned (yyyy-mm-dd)
Decommission Date (yyyy-mm-dd)
Turbine Manufacturer
Turbine Model/Type
Speed (RPM)
Generator Manufacturer
Generator Model/Type
Hydraulic Head (m)
Unit Efficiency (%)
1
Environmental Issues
Issue 1
Please Select Category
Emissions: Pollutants (SOx, NOx, ... )
Emissions: Toxic Chemicals (Hg, Pb, ...)
Emissions: Volatile Organics
Emissions: Particulates
Emissions: Green House Gases
Water Borne Diseases and Water Quality
Water Contamination
Water Depletion
Land Pollution
Land: Toxic Waste
Land Degradation
Land Submersion
Land Subsidence
Soil Erosion
Deforestation
Impact on Wildlife
Impact on Fisheries
Impact on Scenic Beauty
Displacement of People
Other
Description
Past and Future Major Upgrades
Upgrade 1
Cost
Year
-
Owner and Operator Information
Owner 1
% Share
Type of Ownership
Construction/EPC Contractor
Operating Company
Regulatory Authority
Project Financed By
Annual Performance
Performance Statistics for
2020-2029
2010-2019
2000-2009
1990-1999
1980-1989
1970-1979
1960-1969
1950-1959
Comments
Comment 1
References
Reference 1
Notes
*
cum = cubic meters; MWe = Megawatts electric; MM=million; m=meters