|
| |
|
| |
|
| |
|
| |
|
| |
|
| Location | |
| Name of Gas Field Area | |
|
| Type Of Gas Field | |
|
| Design Production Capacity: | Gas (Million cum/year) Liquids (bbl/year) |
| Average Daily Production: | Gas (1000 cum/day) Liquids (bbl/day) |
| Gas Piped To | Name of Plant |
| Plant Gas Processing Capacity | (Million cum/day) Describe |
| Liquids/Condensates Piped to | Name of Plant |
| Plant Liquid Processing Capacity | (Tonnes/day) Describe |
| Number of Active Wells | |
|
| Drilling Technology | Description |
| Waste and Produced Water Management | |
|
| Disposition of Produced Sulphur Compounds | |
|
| Capital Cost Of Plant | and/or In US Dollars In Year (YYYY) |
| Contaminants (%) | |